Wednesday, August 13, 2008

Ambassador Cam, #39: The Skeleton Rises



As the LAUSD prepares to break ground on a new, tiny pocket park and Bobby Kennedy memorial at the Ambassador site (see Curbed LA for full details), construction has already begun on what appears to be the high school portion of the site's three-school complex.

Curbed L.A. had more details last month:

The scope of the project includes a K-3 School, a 4-8 Middle School, and a High School, for a total of 4,624 students. The 92,000-square-foot K-3 building will accommodate 1,150 seats within 46 classrooms on three floors. The school will be located on the Ambassador Hotel site. The 4-8/High School building will accommodate 3,474 seats within 130 classrooms on six floors. The area is 382,000 square feet, and the rehabilitated Cocoanut Grove building is an additional 48,410 square feet of enclosed and covered areas.

The proposed subterranean parking structure will accommodate a total of 442 parking spaces on two levels for faculty and administrative staff. Playfields for the proposed 4-8/HS will be constructed above the parking structure. The scope also includes construction of a gymnasium building. This structure will accommodate the gymnasium court for grades 6-8 and Central Plant equipment on the first floor, and a gymnasium court for grades 9-12 on the upper level. This is one of the first LAUSD schools with an extensive public art program.

Yes, you'll notice that the main, high school building has been designed to emulate the old Ambassador. But it's pretty much a token gesture.